Produces Basic Materials: Wood, Stone, Metal and Sand.
Requires Basic Resources (Water and Electricity) to operate.
→ Read more about Resources & Materials
A Material to be produced in the Industrial building shall be selected after appointing Citizens. Press this block in the Land Info menu:
Material selection window will appear with information about costs for Materials collection. It shows an amount of Resources and Fees required by each type of Material to be collected once they will be ready.
Material can be changed anytime then. However, switching a Material to produce in a building will rested the production cycle and all the previous progress will be lost.
Switching Citizens (appointing new Citizens or removing a Citizen from a building) will restart the production process.
Amount of resources depends on a building Level (its Influence Points) and qualifications of appointed Citizens.
These qualifications affect production results in Industrial buildings the most:
Other qualifications are also considered in a lesser extent.
The highest bonus for Citizen's Strength qualifications is in the Condominium.
Read more about appoiniting a Citizen
Building's Level defines the amount of days and hours required to finish the production cycle, as follows:
Level | Period |
---|---|
1 | 7 days |
2 | 6 days |
3 | 5 days |
4 | 4 days |
5 | 3 days |
6 (Huge) | 48 hours |
7 (Mega) | 24 hours |
Amount of Materials produced by a building on different Levels:
Level | Min. | Max. | Period |
---|---|---|---|
1 | 150 | 375 | 7 Days |
2 | 167 | 418 | 6 Days |
3 | 188 | 469 | 5 Days |
4 | 214 | 536 | 4 Days |
5 | 257 | 643 | 3 Days |
6 (Huge) | 429 | 1071 | 2 Days |
7 (Mega) | 557 | 1393 | 1 Day |
Level | Min. | Max. | Period |
---|---|---|---|
1 | 40 | 160 | 7 Days |
2 | 45 | 178 | 6 Days |
3 | 50 | 200 | 5 Days |
4 | 57 | 229 | 4 Days |
5 | 69 | 274 | 3 Days |
6 (Huge) | 114 | 457 | 2 Days |
7 (Mega) | 149 | 594 | 1 Day |
Level | Min. | Max. | Period |
---|---|---|---|
1 | 75 | 225 | 7 Days |
2 | 84 | 251 | 6 Days |
3 | 94 | 281 | 5 Days |
4 | 107 | 321 | 4 Days |
5 | 129 | 386 | 3 Days |
6 (Huge) | 214 | 643 | 2 Days |
7 (Mega) | 279 | 836 | 1 Day |
Level | Min. | Max. | Period |
---|---|---|---|
1 | 20 | 100 | 7 Days |
2 | 22 | 111 | 6 Days |
3 | 25 | 125 | 5 Days |
4 | 29 | 143 | 4 Days |
5 | 34 | 171 | 3 Days |
6 (Huge) | 57 | 286 | 2 Days |
7 (Mega) | 74 | 371 | 1 Day |
Resources required to construct and upgrade an Industrial Building.
Level | Materials |
---|---|
1 |
828 473 140 |
2 |
1104 631 420 |
3 |
1149 657 438 105 |
4 |
1839 1051 701 420 |
5 |
1314 876 525 222 |
6 (Huge) |
1051 631 266 100 28 or* 28 |
7 (Mega) |
1261 757 319 239 66 or* 66 |
* — Steel is required in Ethereum City, Concrete in TRON City, Plastic in BNB City.